By Isqil Najim
The prize was a multi-billion Naira infrastructure contract—a major international funded project intended to redefine a key port facility in Lagos. The bidders were the talk of the industry: On one side stood Dr. Emeka Dankano (not real name) —a world-class Specialized Engineer and CEO of “Tech-Perfect Solutions.” On the other side was Mr. Kunle Dokubo (not real name)—a sharp, charismatic Manager-CEO of “Integrity & Value Projects.”
Emeka was a genius, the kind of man who could calculate structural loads in his head and design a system that would last a century. His proposal was a masterpiece of technical brilliance. He has vast industry and international experience. He believed quality alone would win.
Kunle’s genius lay in organization, finance, and people. He has worked in management most of his career even though he was a first class engineering graduate. His proposal was meticulously structured, featuring a sophisticated risk profile, a compelling local-content strategy, and a beautifully presented financial model with favorable long-term maintenance provisions. He believed in strategy and compliance.
The project caught public attention due to the enormous values and significance. Media were on high octane campaign against foreign experts handling it. It must be 100% Local content. The name on lips of most commentators was Dr Emeka, whose international working experience and knowledge was well documented.
Even before the winner was announced, congratulatory messages have already started flying around. But their expectations were dashed when the FEC announced the result: Integrity & Value Projects (Kunle Dokubo) had won. Dr. Emeka Ekwueme Dankano, the universally acknowledged superior engineer, had lost.
Emeka was furious. The public was enraged. “How? My design was superior! My materials were 20% stronger! This is why everything goes wrong in this country—it’s all connections and politics!” He fumed. But the shortlisting the winner was handled by external team at world bank, financing the project.
Meanwhile the answer to how the Bid was won and lost, as Engr. Emmanuel Akinwole, (FNSE) a former President of Nigerian Institute of Electrical Electronic Engineers, NIEEE, would analyse, was beyond technical than Emeka realized.
Why Technical Genius Wasn’t Enough
The problem wasn’t Emeka’s engineering; the problem was his bid management. In a high-stakes international project competition, the client isn’t just buying the best blueprint; they are buying the most reliable, least-risky delivery partner. Here is the likely breakdown of what went wrong for the specialized engineer:
1. The most common reason brilliant bids fail is non-compliance.
The Manager (Kunle) likely ensured all mandatory, non-technical documents were 100% compliant and submitted on time, as detailed in Chapter 9.0 (Preparation of Technical Bid) of Akinwole’s book. The Engineer (Emeka) on other hand, driven by technical urgency, may have neglected a minor administrative requirement leading to the entire bid being “technically disqualified” before the design was even properly reviewed.
2. The client’s evaluation committee is half technical, half financial/management.
The Manager’s (Kunle) bid likely detailed a clear “Value for Money” proposition. His pricing as detailed in Chapter 10.0 (Financial Bid) was strategically benchmarked, and his financial bid included strong, structured payment milestones that significantly reduces the client’s risk.
On other hand, the Engineer’s (Emeka) technical superiority likely resulted in a significantly higher price, based on premium materials and complex methods. The client perceived this as “expensive” rather than “superior,” or his cost breakdown was simply not as convincingly tied to the project’s long-term budget, making him an immediate financial outlier.
3. The Communication Barrier, Selling the Whole Package
The Manager’s (Kunle) proposal was beautifully organized, easy to read, and clearly communicated the firm’s overall Organizational Strength, Risk Mitigation Strategy, and Experience (Chapter 6.0: Principles of Good Bid Writing). The evaluators felt confident in the firm’s ability to manage the entire project life cycle.
The Engineer’s (Emeka) bid was dominated by complex technical jargon, abbreviations and specifications that the non-engineering evaluators (lawyers, finance directors) struggled to understand. He assumed his engineering would speak for itself, but subsequently failed to sell the project management competence that the client truly valued for a project of this scale.
The Solution: Akinwole’s Masterplan for Detail
In a bid to help engineers and non engineer alike to avoid fate that befell Dr Emeka, Engr. Emmanuel Akinwole’s BIDDING-AND-WINNING: THEORY, PRACTICE AND APPLICATION is the essential guide to turning a specialized firm like Emeka’s into a winning machine like Kunle’s. Akinwole’s expertise lies in his ability to guide even the non-experienced bid writer to master every necessary detail:
1. Demystifying Compliance Details (Chapter 9.0)
Engr. Akinwole dedicates an extensive section to the preparation of the Technical Bid, going into painful detail on the administrative must-haves for Nigerian contracts. He breaks down every element that typically causes failure. He forces the engineer to think like the manager by detailing the importance of a compelling Company Profile and Evidence of Similar Projects Completed, thereby moving the focus from what we can design to what we have delivered.
2. Elevating Presentation to a Strategy (Chapter 6.0)
Engr. Akinwole understands that the proposal itself is a product. Chapter 6.0 (Principles of Good Bid Writing) and Chapter 11.0 (Format of Bid Submission Proposal) ensure the technical genius is presented with maximum impact. He teaches Planning for Success and Resourcing Your Bid. He guides the reader to allocate time and effort not just to the design, but to the structure, clarity, and persuasive narrative of the entire document.
3. Emphasizing Follow-Up and Learning (Chapter 13.0)
Chapter 13.0 (Bid Result Evaluation and Follow-Up) is a critical tool for Emekas. Akinwole teaches how to conduct a formal Analysis of Bid Result—whether a win or a loss—to understand the client’s true scoring criteria and improve for the next competition. He stresses that even in failure, there is a chance for relationship building and learning, this will ensure the company gets closer to securing the next contract.
In essence, Engr. Akinwole’s book forces the Technical Specialist to adopt the Strategic Discipline of the Manager, proving his point with his own Triple Award story: a winning bid is a harmonious combination of technical excellence, financial prudence, and administrative perfection.
Whether in banking, or with government clients as a Bidder or Contractor, your company’s success hinges on mastering high-stakes partnerships, This book, BIDDING-AND-WINNING: THEORY, PRACTICE AND APPLICATION is essential reading for everyone—from the Engineer on the project, to the Engineering Manager overseeing delivery, and the Managing Director securing the deal.
Written in simple, direct language to convey the critical message clearly, you simply cannot afford to miss the insights on these key collaborations. Order your copy today: +2348053303336
My name is Isqil najim and i can be reached on LinkedIn.

