NSE MEMBERSHIP REGISTRATION GUIDE: TEMPLATE FOR NSE TECHNICAL REPORT AND POST GRADUATE EXPERIENCE REPORT

“MY POST-GRADUATE EXPERIENCE”
VOLUME 1
REPORT PRESENTED TO THE
NIGERIAN SOCIETY OF ENGINEERS
BY
……………………………………………………………………
(TYPE YOUR NAME)
DATE


“MY POST-GRADUATE EXPERIENCE”
REPORT PRESENTED TO THE
NIGERIAN SOCIETY OF ENGINEERS
BY
……………………………………………………………………
(TYPE YOUR NAME)
IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR
REGISTRATION AS A CORPORATE MEMBER OF THE NIGERIAN
SOCIETY OF ENGINEERS
DATE


CERTIFICATE OF SUBMISSION
This is to certify that I, ……………………………………………………………………………… have
written this report myself and it is a true account of my training and working
experience.
…………………………………………………………. …….……………………………………………………………………..
Signature of candidate and date Signature & COREN seal of Senior Engineer
and date
…………………………………………………         ………….……………………………………………………………………
Name of Candidate                         Name of Senior Engineer (NSE no & Phone no)


CHAPTER ONE
1.0 SECONDARY EDUCATION (SCHOOLS ATTENDED WITH DATES)
1.1 HIGHER EDUCATION (SCHOOLS ATTENDED WITH DATES & DEGREES OBTAINED)
1.2 NYSC (PLACE OF PRIMARY ASSIGNMENT WITH DATE)
1.3 CONTINUING PROFESSIONAL DEVELOPMENT: POSTGRADUATE (COURSE AND INSTITUTION WITH DATES)
1.3.1 COURSE 1 (TITLE)
 INSTITUTE
 DATE
1.3.2 COURSE 2 (TITLE)
 INSTITUE
 DATE
1.3.3 COURSE 3 (TITLE)
 INSTITUTE
 DATE
1.3.4 COURSE 4 (TITLE)
 INSTITUTE
 DATE
CHAPTER TWO: PROFESSIONAL/WORK EXPERIENCE
2.0 PROFESSIONAL/WORK EXPERIENCE (5 GOOD MIX)
2.1 WORK EXPERIENCE 1: (POST GRADUATETRAINING: WRITE YOUR TITLED EXPERIENCE)
 TITLE THE ENGINEERING SUBBRANCH/TECHNOLOGY, TRADE SKILL AND
INNOVATION/WORK EXPERIENCE ACQUIRED IN THE COURSE OF PROJECT/WORK)
2.1.1 PROJECT TITLE (AS IN CONTRACT DOCUMENT) OR NAME OF JOB DEPARTMENT
2.1.2 THE ORGANIZATION’S NAME/CLIENT/USER DEPT
2.1.3 STATEMENT OF PROJECT OBJECTIVE
2.1.4 PROJECT DURATION
2.1.5 POSITION HELD
2.1.6 ESTIMATED PROJECT COST (IF ACCESSIBLE)
2.1.7 DESCRIPTION OF THE EXPERIENCE
 PROJECT/NEED (NARRATIVE)
 LEVEL OF PARTICIPATION
 RESPONSIBILITY – SUMMARY OF JOB DESCRIPTION ROUTINE
 PROBLEMS ENCOUNTERED IF ANY AND WHY
 SOLUTION(S) PROFFERED(BASED ON ENGINEERING PRINCIPLES)
 LESSONS LEARNT FROM THE PROJECT FOR PERSONAL DEVELOPMENT
 LESSON S LEARNT FROM THE PROJECTFOR ENGINEERING PROFESSIONAL (NSE)
DEVELOPMENT
 PICTURES

 


“TECHNICAL REPORT”
VOLUME 2
DESIGN AND CONSTRUCTION/SUPERVISION OF
(TYPE YOUR 1ST BEST PROJECT TITLE)
AND
DETAILED REPORT ON (TYPE YOUR 2ND PROJECT TITLE)
PRESENTED TO
THE NIGERIAN SOCIETY OF ENGINEERS (NSE)
BY
TYPE YOUR NAME
DATE


“TECHNICAL REPORT”
THE NIGERIAN SOCIETY OF ENGINEERS (NSE)
BY
……………………………………………………………………..
(TYPE YOUR NAME)
IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR
REGISTRATION AS A CORPORATE MEMBER OF THE
NIGERIAN SOCIETY OF ENGINEERS
DATE


CERTIFICATE OF SUBMISSION
This is to certify that I, ……………………………………………………………………………… have
written this report myself and it is a true account of my training and working
experience.
…………………………………………………………. ……………………………………………………………………………..
Signature of candidate and date        Signature & COREN seal of Senior Engineer
and date
…………………………………           …………………… ………………………………………………………………………
Name of Candidate             Name of Senior Engineer(NSE no & Phone no)


TABLE OF CONTENTS
CHAPTER ONE: DESIGN AND CONSTRUCTION/SUPERVISION OF (FIRST BEST OF
5)
1.0 INTRODUCTION
1.1 JUSTIFICATION OR NEED FOR PROJECT
1.2 PRELIMINARY STUDIES/INVESTIGATIONS
1.3 DESIGN CONSIDERATIONS/CRITERIA
1.4 STANDARDS AND SPECIFICATIONS
1.5 METHODOLOGY AND DESIGN CALCULATIONS
1.6 DRAWINGS
1.7 PREPARATION OF BEME (INCLUDING TAKE – OFF SHEETS)
1.8 CONSTRUCTION/INSTALLATION/ANALYSIS/TEST & CALCULATIONS
1.9 ANALYSIS OF TEST RESULTS AND COMMISSIONING
1.10 PROJECT OUTCOME

CHAPTER TWO: DESIGN AND CONSTRUCTION/DETAILED REPORT OF (YOUR 2ND
PROJECT TITLE) PREFERABLY SECOND PROJECT SHOULD BE ANOTHER FIELD –E.G 
IF FIRST IS A BUILDING PROJECT, SECOND MAY BE HIGHWAY OR WATER TO AVOID REPETITION
2.0 INTRODUCTION
2.1 JUSTIFICATION OR NEED FOR PROJECT
2.2 PRELIMINARY STUDIES/INVESTIGATIONS
2.3 DESIGN CONSIDERATIONS/CRITERIA
2.4 STANDARDS AND SPECIFICATIONS
2.5 METHODOLOGY AND DESIGN CALCULATIONS
2.6 DRAWINGS
2.7 PREPARATION OF BEME (INCLUDING TAKE – OFF SHEETS)
2.8 CONSTRUCTION/INSTALLATION/ANALYSIS/TEST & CALCULATIONS
2.9 ANALYSIS OF TEST RESULTS AND COMMISSIONING
2.10 PROJECT OUTCOME
CHAPTER THREE: CONCLUSION AND RECOMMENDATION
3.1CONCLUSION
3.2RECOMMENDATIONS


SPECIAL NOTE TO ALL PROSPECTIVE NSE INTERVIEW CANDIDATES:
• The following instructions are worth noting
– Soft copies to be submitted to pd@nse.org.ng using the format as
Email Subject heading (FULL NAME – YOUR APPLICATION CATEGORY –
DISCIPLINE. An example is (ABDUL OJO CHINEDU – B1/B2 –
ELECTRICAL). The document should also be named in your full name.
– A4 size paper is to be used
– Spacing of ¾ inch (16mm) on top, bottom and right side of each page except
the title page and the first page of each chapter which has to be 2/3 inches
(18mm)
– Spacing of 3/2 inch (38mm) on left side of each page for ease of binding
– Title should be centred
– A certification page must be included that will have a Registered Engineer
(financially up to date in both COREN and NSE) appending or attesting to your
competence
– Manuscript should be double spaced
(Allow an extra half space above a line containing superscript and below one
containing subscript)
– Page numbering should be at bottom of page and centred
– 12 Times New Roman should be the font
– Neatness

LEAVE A REPLY

Please enter your comment!
Please enter your name here